Price the BQ once.
Then track every VO.

One floor, seven or eight subcontract packages, and variation orders arriving all through the job. materialpro maps each BQ section to a cost code and shows budget, committed and invoiced side by side — an overspend is visible once the PO is approved, not when the invoice turns up.

One contractor, many packages

  • 01Strip-out
  • 02Wet trades
  • 03Carpentry
  • 04E&M
  • 05Painting
  • 06Lighting
  • 07Furniture

Programme and ordering

Seven packages, one handover date

Trades overlap, so material has to be ordered before each one starts — and lighting and furniture have long lead times. The last week to order sits right beside each package.

  • On site
  • Order by

Sample programme for illustration

  • Strip-out

    Demolition subcontract, waste removal

    Weeks 1–2 · Order by week 1

    Weeks 1–2. Order by week 1.
  • Wet trades

    Cement, sand, floor tiles, stone

    Weeks 2–5 · Order by week 1

    Weeks 2–5. Order by week 1.
  • Carpentry & ceilings

    Plywood, gypsum board, ironmongery

    Weeks 4–8 · Order by week 2

    Weeks 4–8. Order by week 2.
  • E&M

    Cable, switches, plumbing fittings

    Weeks 3–9 · Order by week 1

    Weeks 3–9. Order by week 1.
  • Painting

    Skim coat, emulsion paint

    Weeks 8–10 · Order by week 6

    Weeks 8–10. Order by week 6.
  • Lighting

    Luminaires, drivers (long lead)

    Weeks 9–11 · Order by week 2

    Weeks 9–11. Order by week 2.
  • Furniture

    Desks, chairs, storage

    Weeks 10–12 · Order by week 3

    Weeks 10–12. Order by week 3.

Every job's sequence and lead times differ; working and delivery hours follow the building management's rules.

BQ cost board

Budget, committed and invoiced, one line per section

BQ sections become cost codes: purchase orders count as committed, invoices as invoiced. Each variation order gets its own code and is layered over the original budget. Open any row to see the documents behind it.

Kwun Tong · Office fit-out

HK$ thousands · Sample data for illustration

  • Invoiced
  • Committed, not yet invoiced
  • Budget remaining
  • Approved VO
  • Pending VO
  • Over budget
  • Documents · FO-04

    • VariationVO-01 Additional floor boxes· Approved+64
    • VariationVO-05 Sprinkler head relocation· Pending+118
    • POPO-0122 Electrical subcontract540
    • POPO-0124 Plumbing & drainage subcontract138
    • POPO-0136 Sprinkler head relocation· VO-05118
    • POPO-0138 Floor box additions· VO-0164
    • InvoiceINV-3122 Electrical · stage 1260
    • InvoiceINV-3124 Plumbing & drainage138
TotalRevised rate HK$608 per sq ft
Budget
4,380
Committed
4,148
Invoiced
1,928
Variance
+232

Committed counts approved or issued purchase orders; budget = BQ plus approved VOs, and variance = budget minus committed. Each VO is recorded on its own cost code — the overlay here is an illustration.

A fit-out contractor's week

Four things that eat a fit-out job

  • 01

    “The carpenter says the client wants a glass partition. The VO isn't signed, but the material's already ordered.”

    Give each VO its own cost code and budget it there. POs raised under it stay out of the original BQ section, so committed cost never blurs.

    Handled in materialproProjects · Cost codes · POs

  • 02

    “Every package needs three or four subcontract quotes, and nobody can tell what each one includes.”

    Send one scope to several subcontractors, who can submit quotes through a link. AI helps read quotation PDFs and photos, lays them side by side, and the chosen one converts to a PO in a step.

    Handled in materialproRFQ · Quote comparison

  • 03

    “Building management only lets goods in at certain hours. Miss the slot and it waits another day.”

    Put delivery dates in the delivery calendar. Site staff photograph the delivery note, AI extracts items and quantities and matches the PO, and shortfalls are listed straight away.

    Handled in materialproDelivery calendar · Receiving

  • 04

    “The final-account invoice arrives and retention, what we've paid and what we ordered don't tie up.”

    Invoices are checked three ways against the PO and receiving record, with committed and invoiced side by side on the same cost code. Variances come to you before payment; retention still follows your subcontract.

    Handled in materialproThree-way invoice check

Trade vocabulary

Words you hear on a Hong Kong fit-out

Quoting, cost control and close-out all revolve around these terms.

工料清單 (BQ)
The priced list of quantities and rates for each item of work; the basis for tender, quotation and budget.
Bill of Quantities
變更指令 (VO)
An instruction from the client or consultant to add or omit work outside the contract. It counts towards the sum only once approved and priced.
Variation Order
暫定金額
A sum held in the BQ because scope or price isn't settled; adjusted later to actual quantity or quotation.
Provisional Sum
呎價
Fit-out cost per square foot. Used for early budgets and quotes, and still used to sanity-check the final BQ.
Cost per sq ft
分判商
A specialist the main contractor sublets a package to, such as E&M or painting.
Subcontractor
保留金
A percentage held back from each payment and released at the times the contract sets, usually tied to completion and the defects period.
Retention money
尾數
The last payment under a contract, or the balance left once retention is applied; usually settled with acceptance and snagging.
Final account / final payment
執漏
Walking the finished space item by item and fixing whatever is not right.
Snagging / defects rectification
管理處
The building's management office. Its approval is needed before fit-out starts, and it sets working and delivery hours.
Building management office
入伙 · 交吉
Handing the finished unit over to the owner or tenant. Once the date is fixed, the programme counts down to it.
Handover / vacant possession
註冊專門行業承造商
The CIC registration scheme; interior fitting-out works is one of its designated trades.
CIC RSTCS — interior fitting-out works

FAQ

What fit-out contractors ask first

Our BQ is an Excel file. Do we have to re-key every line?

No. Set each BQ section or trade up as a cost code under the project and enter its budget; cost codes can be nested. Line-by-line rates and quantities can stay in your own BQ file — materialpro handles the money once you order, receive and are invoiced.

How do we record variation orders?

Open a separate cost code for each VO with its amount, and POs and invoice lines coded to it stay clear of the original BQ section. Whether a VO has been approved by the client is your call to manage; the system doesn't decide that for you.

Do our E&M and painting subcontractors need to use materialpro?

No. Register them as vendors, send them requests for quotation, and they submit quotes through a link. Once you choose one, your office converts it to a PO.

Does materialpro replace our accounting system?

No. materialpro focuses on procurement, receiving and stock records. How it connects with your accounting system is something we can cover in a demo.

Can it handle building management approvals or fit-out permits?

No. Approvals and permits stay with you and your consultants. materialpro does not file anything with a government department or building management; it records procurement and cost.

Make the BQ tie up from the moment you order

Book a demo and we will walk through one of your fit-out BQs — from request for quotation to PO to invoice.