Plumbing & drainage · Risers · Floor-by-floor issue

Every riser traced,
every floor papered

Plumbing and drainage is built riser by riser and floor by floor, with dozens of pipe sizes, fittings and valves that each need a source behind them. materialpro keeps requisitions, quotes, receiving and issue under one project, and checks every supplier delivery note and invoice line by line.

  • Cold & hot water
  • Foul & storm drainage
  • Tanks & pump rooms
TankPumpsColdHotFoulStormRF6/F5/F4/F3/F2/F1/FG/FB/F
Riser diagram · Sample data for illustration

Who is watching

Three departments, three sets of paperwork

To account for where material came from, start with who cares about which part.

  • WSD

    Water Supplies Department

    Water supply and water fittings. Pipes, fittings and valves on the supply side must meet its requirements, and supply plumbing work is carried out by a licensed plumber.

  • DSD

    Drainage Services Department

    The public sewerage and stormwater systems. Where building drainage connects to a public drain, the department's requirements apply.

  • BD

    Buildings Department

    Drainage works inside buildings. Plan submission and completion inspection are generally handled through the Authorized Person.

This is the general split only; actual requirements rest with each department and your Authorized Person. materialpro does not file anything with any department. It handles procurement, receiving and issue records.

Pipe and fitting range

One project, eight material families, eight ways of buying

Copper, stainless steel, UPVC and valves all sit on one riser. Each counts in a different unit and needs different documents.

  • Copper tube

    Typical useCold and hot water supply, exposed and concealed runs

    Check before buyingSize, wall-thickness grade, source batch

    CountedTube by metre; fittings by piece

  • Stainless steel tube

    Typical usePotable and hot/cold water; tanks, pump rooms and risers

    Check before buyingSize, material grade, matching couplings

    CountedTube by metre; couplings by piece

  • PPR pipe

    Typical useHot and cold water branches inside flats

    Check before buyingPipe series and pressure rating; fusion fittings from the same system

    CountedPipe by metre; fittings by piece

  • UPVC drainage pipe

    Typical useFoul, waste, storm water and venting

    Check before buyingSize, jointing method, solvent cement and seals

    CountedBy length or metre

  • HDPE pipe

    Typical useStorm water and some drainage; buried or butt-fused

    Check before buyingSize, pressure class, fusion fittings

    CountedPipe by metre; fittings by piece

  • Ductile iron pipe

    Typical useLarge-bore and buried drains and mains

    Check before buyingSize, joint type, coating and test records

    CountedBy length or metre; joints by piece

  • Gate, ball and check valves

    Typical useIsolation, shut-off and backflow prevention; at each flat entry and pump outlet

    Check before buyingBore, pressure rating, end connection, approval documents

    CountedBy piece, split by bore

  • Water meters

    Typical useMetering per flat or zone; the main meter follows the water supplier's arrangements

    Check before buyingBore, model, relevant approval documents

    CountedBy piece

Riser diagram

Tap a floor, see what was issued

Plumbing is built riser by riser, floor by floor. Which pipe, fitting and valve went where, with the state of its paperwork, on one page.

Riser diagram · issue by floor

Sample data for illustration

TankPumpsColdHotFoulStormRF4 lines6/F4 lines5/F4 lines4/F4 lines3/F4 lines2/F4 lines1/F3 linesG/F4 linesB/F3 lines
  • Approval docs · On file
  • Approval docs · Missing

Tap a floor, or use the up and down arrow keys

4/F

Typical floor

Lines issued
4
Approval docs
3/4
Test records
4/4
  • 22 mm × Copper tube

    Cold

    36 m

    Approval docsOn fileTest recordPassed
  • 22 mm × Check valve

    Cold

    6 pcs

    Approval docsMissingTest recordPassed
  • 15 mm × Copper tube

    Hot

    28 m

    Approval docsOn fileTest recordPassed
  • 110 mm × UPVC pipe

    Foul

    12 m

    Approval docsOn fileTest recordPassed

Illustrative screen: document and test states are there to show the problem this page is meant to solve. Issues post to the stock ledger line by line; how approval documents and test records map to them can be walked through in a demo, your way.

Paperwork follows the pipe

Five hand-offs from delivery to payment

Every step has someone who must answer for it: where it came from, which floor it went to, whether it was tested, whether the price is right.

  1. 01

    Receive

    Handled in materialpro

    When the truck arrives, site staff photograph the delivery note; items, sizes and quantities are matched to the PO and shortfalls are listed straight away.

    Delivery note

    Delivery receiving · AI extraction

  2. 02

    Match documents

    Still your call

    Pipes, fittings and valves must tie to their approval documents and batch details. That is a professional judgement for you and your plumber; materialpro keeps the receiving date and delivery note as the record.

    Approval docs · batch

    Receiving record · vendor records

  3. 03

    Issue by floor

    Handled in materialpro

    Material goes out from the yard or site store by riser and floor. Every issue posts to the stock ledger, and leftovers can be transferred or returned.

    Issue record

    Multi-warehouse stock · stock ledger

  4. 04

    Install and test

    Still your call

    Pressure and drainage tests are carried out and recorded by your plumbers and the people concerned; leftovers go back into stock afterwards.

    Test record

    Returns · stock back in

  5. 05

    Check and pay

    Handled in materialpro

    Supplier invoices are compared with the PO and the receiving record, and price or quantity gaps come to you before payment.

    Invoice

    Three-way invoice check · approvals

A plumbing contractor's week

When pipe stock does not add up, it is usually one of these five

  • “We finished the 6/F riser and only then found two Y-tees short.”

    Site photographs the delivery note; AI extracts items and quantities and matches the PO, so shortfalls are listed on the day of delivery rather than on the floor.

    Delivery receiving

  • “How much more is 25 mm than 20 mm pipe? Three suppliers, three quote formats.”

    Send one material list to several suppliers; AI helps read PDF or photo quotes, lays them side by side, and the winner becomes a PO.

    RFQ and quote comparison

  • “Handover is next week and nobody can say which batch went to which floor.”

    Every issue posts to the stock ledger and delivery-note photos are kept, so you can follow a batch from receiving through to issue.

    Stock ledger

  • “The invoice says 50 mm, we received 40 mm, and the unit price crept up.”

    The invoice is checked against the PO and the receiving record; price and quantity gaps are listed for your review before anything is paid.

    Three-way invoice check

  • “Black rainstorm, typhoon, the truck can't get up. The pump lift date moves again.”

    The delivery calendar lists each project's arrivals by day, so a reschedule shows which deliveries it touches.

    Delivery calendar

Trade vocabulary

Words on a Hong Kong plumbing and drainage site

You will see these on quotes, delivery notes and handover documents.

立管
The vertical main running through many floors, managed by number. Issue and handover usually go by riser first, then by floor.
Riser / stack
持牌水喉匠
A plumber licensed by the Water Supplies Department to carry out supply plumbing work.
Licensed Plumber (WSD)
樓宇排水裝置
Drainage pipework inside a building. A designated trade under the CIC Registered Specialist Trade Contractors Scheme.
Building drainage (CIC designated trade)
認可文件
Documents showing a material or fitting meets requirements for its use. They have to tie to the delivered batch.
Approval / compliance documents
污水 · 雨水
Foul water (toilets, kitchens) and storm water drain separately, in different pipe materials and sizes.
Foul / storm water
閘閥 · 球閥 · 止回閥
Gate valves isolate, ball valves shut off quickly, check valves stop backflow.
Gate / ball / check valve
分喉 · 寸喉
Pipe sizes named in inches: 四分 is ½ in, 六分 is ¾ in, 一寸 is 1 in. Quotes often mix them with millimetres.
Nominal size (inch / DN mm)
三通 · 彎頭 · 異徑
Fittings that branch, turn and change bore. Bought in volume and the easiest line to come up short.
Tee / elbow / reducer
水箱 · 泵房
Storage and pressurising plant on the roof and in the basement, where the large-bore pipe and valves gather.
Water tank / pump room
水壓測試
Pressurising installed pipework to check for leaks. The record is part of the handover documents.
Pressure test

FAQ

What plumbing and drainage contractors ask first

We track by riser and by floor. How does materialpro handle that?

Material is recorded against the project and a cost code, and you can use risers or floors as codes. Every issue posts to the stock ledger and can be traced line by line. How the codes are set up can be shaped to your method in a demo.

Can approval documents and test records live in materialpro?

materialpro's core is requisitions, quotes, POs, receiving, stock and invoices, and the delivery-note photos taken on site are kept as proof of delivery. How approval documents and test records map onto issue records is best discussed in a demo, against how you work now. It does not replace any statutory certificate or file anything with a department.

Pipe is counted in metres and fittings in pieces. How is stock kept?

Each material has its own unit of measure and category: metres for pipe, pieces for fittings and valves. Balances are held per warehouse, and different bores can be kept as separate materials.

How do we catch a delivery with a different size or brand from the PO?

Site photographs the delivery note; the system extracts items and quantities and matches them to the PO, and shortfalls and variances are listed at once. The invoice is then compared with the PO and the receiving record, and price or quantity gaps come to you before payment.

Does materialpro replace our accounting system?

No. materialpro focuses on procurement, receiving and stock records. How it connects with your accounting system is something we can cover in a demo.

Know where every length of pipe went

Book a demo and we will walk through receiving to floor-by-floor issue with your own risers and material list.