Know how much block is still owed after every truck.

The field records what each truck brought and what it refused. From the PO, the office opens the latest delivery and sees, line by line, what came, what was refused, what's been received to date and what's still to come.

The real app · sample figures in USD
Three fixes

Three places masonry jobs lose time and money

Each demo is the real app with sample figures in USD. RFQ means request for quotes; PO means purchase order.

  1. 01What we hear

    “One supplier quotes the block, another the mortar, and nobody quotes the ties.”

    Get every supplier on the same lines, then award each to the lowest

    Send one RFQ for block, mortar and ties, in the units you buy them. Each supplier's prices line up line by line. Award best price gives each line to its lowest quote, and Generate POs creates one PO per supplier.

    Saves money|Each line goes to its cheapest supplier, not the whole order to one.

  2. 02What we hear

    “Two crews on the wall and we've run out of wall ties.”

    Set a minimum, and check the low-stock list before the weekly order

    Give each item a minimum for the jobsite. The Low Stock filter shows everything at or below it, and the item's page says how far below the minimum it is.

    Saves hours|Ties and mortar get ordered before the wall stops.

  3. 03What we hear

    “Face brick went over budget and nobody saw it until the pay app.”

    See each package's spend against its budget, PO by PO

    Give CMU, face brick and mortar their own cost codes with a budget. Each PO counts against its code once it's approved, and opening a code lists the POs behind its total.

    Saves money|An overrun shows when the PO is approved, not at the next pay app.

Your material list

Keep the specification with the order

Record the size, grade and buying unit on each line, then use the order to check what arrives and what is billed.

  • CMU by size, weight and strength
  • Face brick by product, size and color
  • Type N and Type S masonry cement and mortar mix by bag
  • Wall ties and ladder or truss joint reinforcement
  • Steel angle lintels by size and length
  • Through-wall flashing, weeps and anchors

Masonry

Before you start

Can suppliers quote per cube while we order per block?

Not on the same material: units are never converted, so pick one buying unit for each material, per block or per cube, and put it on the RFQ. Every supplier quotes in that unit, and ordered, received and billed quantities compare directly.

How do we record broken block?

Key the block accepted and the block refused on the phone, with the reason and a photo. Refused block isn't booked as received, and the delivery record shows what's still to come on each line.

Can CMU and face brick costs stay separate?

Yes. Give each package its own cost code with a budget. Approved POs count against their code, and the spending report shows each code's total and the POs behind it.

Make your next block order easy to account for

Start with one jobsite and one PO. Everything else can stay as it is.