materialpro Logo
  • External wall repair
  • Spalling concrete
  • Drainpipe replacement
  • Window replacement

Building repair · MBIS · MWIS

Three quotes, line by line,laid out for the committee

Once the Buildings Department notice lands, the owners' corporation has to tender, compare and vote, with every owner watching the numbers. materialpro helps property managers and repair contractors keep RFQs, quote comparison, purchase orders, deliveries and invoice checks in one place, so each figure has a source.

Book a demo and follow one repair job from RFQ to invoice check

Quote comparison

External wall repair, residential block

HKDABC
Spalling concrete repair264k281k249k
External drainpipe replacement128k119k134k

Sample data for illustration

OC meeting

Agenda

  1. 1.Approve tender documents and assessment criteria
  2. 2.Open tenders, compare quotes side by side
  3. 3.Discuss and resolve on the contractor

Sample agenda for illustration

After the statutory notice

Two mandatory schemes, one set of numbers to account for

Owners share the cost of inspection repairs, so every step needs a document, a comparison and a resolution.

30+years old

Mandatory Building Inspection SchemeMBIS

The Buildings Department notifies owners of buildings 30 years or older, who must appoint a qualified person to inspect and carry out the repairs required. Inspections then repeat periodically.

10+years old

Mandatory Window Inspection SchemeMWIS

For buildings 10 years or older, owners must appoint a qualified person to inspect windows and repair what is found wanting. Inspections then repeat periodically.

OC

Owners' corporation

Acts for all owners on repairs. Above a certain value, procurement must go to tender under the Building Management Ordinance and be resolved at an OC meeting.

General description only. The Buildings Department notice and the relevant ordinances set the actual requirements.

Tender to handover

Seven steps, a document at each one

Pick a step to see who runs it, what paper it produces, and where materialpro helps.

Step 3 / 7

Tender opening

Tenders are opened one by one and each price goes into the comparison sheet against the same scope, line by line.

Who runs it
OC committee, consultant

materialpro handles

Side-by-side comparison: AI helps read quotation PDFs or photos and lays them out by item.

Document at this step

Tender opening record

  • Summary of each tender
  • Line-by-line comparison
  • Programme and warranty terms

Quote comparison

Three contractors, line by line

The lowest price on each line is marked. Take the optional items out of the total and the lowest bidder can change.

Tender comparison sheet

Sample: external wall and window repair, residential block

Sample data for illustration · HKD

Scaffolding and netting

Bamboo, with netting

Contractor A
186,000
Contractor B
172,000
Lowest
Contractor C
198,000

Spalling concrete repair

Hack off, treat rebar, reinstate

Contractor A
264,000
Contractor B
281,000
Contractor C
249,000
Lowest

External plaster and repaint

Primer and finish coats

Contractor A
289,000
Lowest
Contractor B
298,000
Contractor C
305,000

External drainpipe replacement

With clamps and fittings

Contractor A
128,000
Contractor B
119,000
Lowest
Contractor C
134,000

Aluminium window replacement

Windows needing repair under MWIS

Contractor A
356,000
Contractor B
342,000
Lowest
Contractor C
371,000

Site management and safety

Lump sum

Contractor A
48,000
Contractor B
56,000
Contractor C
41,000
Lowest

Total

Contractor A
1,271,000
Contractor B
1,268,000
Lowest total
Contractor C
1,298,000
Lines where lowest
1 / 3 / 2(A/B/C)
Programme
22 / 26 / 24 wks(A/B/C)
Warranty
12 / 24 / 12 mths(A/B/C)

Lowest is not always best: programme, warranty, track record and payment terms still need discussing at the OC meeting. The sheet only organises quotes; the OC and its consultant decide.

Typical repair scope

One building, five different pricing units

Quotes rarely share a unit, so line them up before comparing. These are items commonly found in a repair BQ.

  1. 01

    Scaffolding

    Main materials

    Bamboo poles, lashings, netting

    Usual pricing unit

    Lump sum; time extensions often priced separately

    Where it goes wrong

    A longer programme adds scaffold weeks, and owners ask why the price moved

  2. 02

    Spalling concrete repair

    Main materials

    Repair mortar, rebar treatment

    Usual pricing unit

    Per location or per area; quantities often provisional

    Where it goes wrong

    Real damage only shows once opened up, so provisional quantities creep

  3. 03

    External plaster and repaint

    Main materials

    Cement mortar, skim coat, external paint

    Usual pricing unit

    Per m² or per sq ft; many contracts remeasure

    Where it goes wrong

    Estimated area does not match the measured area

  4. 04

    Drainpipe replacement

    Main materials

    Drain pipes, clamps, connectors

    Usual pricing unit

    Per metre or per length

    Where it goes wrong

    Different bore and material specs make quotes hard to compare

  5. 05

    Window replacement

    Main materials

    Aluminium windows, glass, frame fittings

    Usual pricing unit

    Per window, by size

    Where it goes wrong

    Different window types and glass thickness, so unit rates do not compare

Committee, manager, site

Everyone on a repair job has their own headache

  • OC committee member

    “The three quotes are in three formats. I can't tell which line is dear and which is cheap, so the meeting goes round in circles.”

    AI helps read quotation PDFs or photos and lays them out by item, side by side, so the meeting can go through them line by line.

  • Property manager

    “An owner asks why the sum went up and I have to dig through the file to answer.”

    Purchase orders go through an approval workflow before they are issued, and the approval trail is kept for later.

  • Site foreman

    “Materials turn up, the note doesn't match the order, and nobody has counted what's up on the scaffold.”

    Site photographs the delivery note, AI extracts items and quantities and matches the PO, and shortfalls and variances are listed straight away.

  • Contractor

    “At completion the invoice doesn't agree with what we received, and payment sits waiting.”

    Invoices are checked against the PO and the receiving record, and price and quantity variances go to a person before payment.

Words on the job

Terms you will hear on a building repair

Notices, tenders and meetings all revolve around these.

強制驗樓計劃
Statutory notice from the Buildings Department to owners of buildings 30 years or older: inspect and repair.
Mandatory Building Inspection Scheme (MBIS)
強制驗窗計劃
Windows in buildings 10 years or older must be inspected and repaired periodically.
Mandatory Window Inspection Scheme (MWIS)
屋宇署
The department that issues the notices and regulates building safety.
Buildings Department (BD)
法團
Formed by owners under the Building Management Ordinance to run the building and its repairs for all owners.
Owners' Corporation (OC)
認可人士
The professional the OC hires, often to prepare tender documents, supervise works and check completion.
Authorized Person (AP)
招標・比較報價
Inviting several contractors to price the same scope, then comparing line by line.
Tender / quotation comparison
開標
Opening the tenders and revealing each contractor's price.
Tender opening
法團會議
A general meeting or management committee meeting that decides on the contractor.
OC meeting
石屎剝落
Concrete that breaks away when the rebar inside rusts and swells; it must be hacked off, the bar treated, then repaired.
Spalling concrete
暫定數量・實量
Quantities estimated at tender and settled by measurement after the work.
Provisional quantity / remeasurement
保養期
The period after completion when the contractor must rectify defects.
Defects liability period

FAQ

What OCs and property teams ask most

Does materialpro run the OC tender or file anything with the Buildings Department?

No. Tender documents, inspection reports and anything submitted to the Buildings Department stay with the authorized person or consultant. materialpro covers the purchasing side: RFQs, quote comparison, purchase orders, deliveries and invoice checks.

Can a property management company use it to compare contractor quotes?

Yes. Send an RFQ to several suppliers or subcontractors, who can submit quotes through a link. PDFs and photos you already hold are read with AI help, compared side by side, and the chosen quote can become a purchase order. We suggest a colleague checks what the AI has read.

Can the comparison go straight to the OC meeting?

It is a tool for organising quotes. Whether to rely on it and how to resolve is up to the OC and its consultant. We would attach each contractor's original quotation to the meeting papers.

How do scaffolding, wall repair and window replacement sit in one project?

Set them up as one project and use cost codes to keep each package's materials and spend apart. For scaffold stock, a site can be a warehouse so every movement is recorded.

Will materialpro replace my accounting system?

No. materialpro focuses on purchasing, receiving and stock records. How it connects with your accounting system can be covered in a demo.

Every quote laid out, every figure explainable

Book a demo and we will walk through an owners' corporation repair job, from RFQ and side-by-side comparison to delivery and invoice checks.